Duration: 5-6 Weeks.
Single storey kitchen extension with open plan.
- Demolition: Remove existing external windows, internal doors, frames, architraves, window boards and skirtings and dispose off site.
- Substructure: Foundations to current regulation: 900mm wide strip foundations, 150mm insulation to floor with 100mm concrete slab & radon barrier.
- External Walls: Wall with a thermal value of U-Value (W/m2K) 0.20
- External Wall Finishes: Any colour Synthetic acrylic render Baumit GranoporTop
- Roof Finish: Warm Roof construction with a Fiberglass Finish.
- Roof Completions: 2000 x 1000MM Triple Glazed Aluminium Roof Light
- Mechanical: 2 Radiators connecting to the existing system.
- Electrical: 4 Double Sockets with USB, 1 Pendant Light
- External Wall Completions: 3000 x 2100 Aluminum Sliding Door.
- Internal Wall Finishes: 3mm skim to new walls.
- Airtightness: Airtightness membrane and tape to roof, windows and doors.
- External Works: Footpaths to perimeter.